坐爆你的钢筋的英语,钢筋的英文单词

1.AllinEnglishImperialUnit.全部使用英文和英制单位。2.Arepartdimensionstoprintplusshrink?请检查内模尺寸有否乘缩水?3.Allwiresp

1.All in English & Imperial Unit. 全部使用英文和英制单位。

2. Are part dimensions to print plus shrink?请检查内模尺寸有否乘缩水?

3. All wires protected from sharp corners?凡有电线通过的角位要改为R角,是否完成?

坐爆你的钢筋的英语

4. All replaceable components must bestandard components. 所有替换的元件必须是标准件。

5. Add shot counter?是否加啤塑总计器?

6. A complicated mould with thorough designconsideration toovercome the numerous design contraints. 一个复杂的模具,设计经过周详考虑,成功地克服了各种设计上的限制。

7. All moving components should usehardened steel : all slidesshould be installed with hardend or lubricated alloywear plates and gibs,andwith positive slide retainer. 所有移动的零件应使用硬钢料,行位必须用硬垫板和硬线条,而且必须有限位及定位锁。

8. BOM including waterfittings,ejectors&custom components. BOM的内容应包含运水接头,顶针和自制的零件。

9. BeCu for lifters if w/o water circuits。若没有运水回路,斜顶为铍铜。

10. Corresponding components mirrored atcore&cavity. 对应的部件在前、后模平面视图中镜像。

11. Check polish for line of draw finish?有否省光就出模?

12. Core pull slot mechanism installed andO.K.

13. Crane capacity and loading clearance. 模具须用多大吊机才可搬动。

14. Conduct moldflow&mold warpanalysis. 经流道及变形电脑模拟分析。

15. Component and/or 3D mould designdrawing. 散件图或3D模具图。

16. Cooling less important when dimensionsare not important. 若尺寸不重要,适量冷却也可。

17. Combine a traditional 4 cavity edgegate and a 4 cavitiesreverse gate mould which help to double the mouldingcapacity and reduceproduction cost. 将一个标准四模腔大水口模具与一个四模腔倒转大水口模具结合成为一套可于同一大小的注塑机,生产量可增加一倍的层板模具,并且可降低成本。

18. Can be seperated into two individualmoulds for moulding in twodifferent mould shops. 此模具最大的特式是,可将模具分开变成两套,在不同地方生产,增加生产的灵活性。

19. Consists of all standard mouldcomponents which facilitatesmould maintenance. 由于全套模具均利用模具标准零件制成,在维修及换零件上比较方便。

甲:没事,我用笑里藏刀为你作手术,取出你的钢筋铁骨,用磨杵成针缝合你的伤口,再用桃源乐土止住向外流的呕心沥血。 乙:可是我的腿伤后短了一裁,走道高一脚低一脚。 甲:没关系,我采取取长补短的方法,解决你的特立独行问题,这不就。

20. Die draw called out 出模方向的标示

21. Dimension all the opening ,travel& clearance. 标出前、后模距离,滑动部件滑动距离和塑件脱离的位置。

22. DME egr. Water fittings recessed andmarked?是否使用DME运水接头及编号?

23. Delivery right side up ,钢筋的英文单词,or in twohalves?开箱后是否容易吊出模具及是否分开前/后模运输?,

24. Eyebolt size and balance in 2 sides. 吊模孔尺寸,平衡,4边都要有。

25. Ejection stroke & slide,liftertravel dimensioned. 出行程、行位、斜顶行程的标注。

26. Ejection study if lifteradopted. 若有斜顶,做出分析。

27. Ejection extended at the most. 顶出到极限位置。

28. Ejector guide pins installation. 顶针导柱的安装。

29. Eyebolts for inserts more than 50lbs. 重量大于50lbs的镶件必须要有吊模孔。

30. Edge gate or sprue gate requiringsecondary operationacceptable. 边缘型或直入型水口都可以接受。

31. 4 point in HRC different to lifterscontacting or cavity steel. 斜顶和与其接触的内模或镶件在硬度上有4度的差别(HRC)。

32. 4X size section ,dimensioned toreflect the actual size. 水口及水口顶针的4倍放大视图,按实际尺寸标注。

33. General ,safety and handling. 常规、安全和搬运要求。

没有bodom这个单词,应是:bosom。意思是:胸;胸怀。重点词汇:bosom 英 ['bʊzəm]释义:n 胸;胸怀;中间;胸襟;内心;乳房;内部 vt 怀抱;把…藏在心中 adj 知心的;亲密的 n (Bosom)人名;(。

34. Guided ejection recommended for mouldabove 100 tons clampcapacity,ejector pins of 1.5mm or smaller,or ejectorstroke longer than 50mm. 建设模具用于锁模力超过100吨的注塑机,或有1.5mm以下的顶针或顶出行程超过50mm时,应装上顶针板导柱。

35. Guide pin cleared and vented?边钉插入模板有否顶着及加疏气空?

36. Hot manifold wired to print and checked?热咀电线接位有否编号?

37. Horn pin clearance hole?斜边与行位有否空间?

38. Hydraulic actuated slide together withelectrical limit switch. 行位采用油压推动,配合安全电制。

40. Inserts keyed and numbered to preventincorrect assembly. 镶件定位和编号以防止不正确的组装。

41. Jaw angle 3 deg.more than anglepins(<25 degree). 斜面角度要比行位斜边角度大3度(<25度)。

42. Keep enough space to run waterline atslide /lifter/majorinserts. 在行位、斜顶、主要镶件处保留足够位置(空间)布置水槽。

42. Lifter angle less than 15 degree. 斜顶角度小于15度。

43. Lifter rods dia,less than 1". 斜顶杆直径不能少于1"。

44. Limit switch in tact and protected. 是否已安装限位制?

45. Moldbase and steel dimensioned. 模坯和钢料号的标注。

46. Minimum 5 deg.for shut-off. 斜顶镶件最小5度插穿。

47. Mechanism for sequence?动作机构是否正确?

48. Mold safety straps installed andpainted red?是否已安装安全带及喷上正确颜色在模坯上?

50. Mould should be designed with maximumcooling and withappropriate amount of ejection points. 模具在设计上要做到尽快冷却,上、下内模高温点应该有个别的冷却,应有适量顶针。

51. Mould should be able to run fullyautomatic. Large part shouldbe picked up by robot. 模具能够全自动生产,大的零件应由机械手拿出。

52. Mould should be tested to meet adefined Cpk quality standard. 模具经过测试,符合预定的Cpk质量标准。

53. Mould should have safety features toprotect accidental damage,incorrect assembly and set up of mould. 模具应具备可以预防意外损害及错误安装等安全特性。

54. Mould halves requiring accuratealignment of core and cavity,and shut off should have appropriate part linelocks. 上、下模需要精确配合或有擦位的地方,模具一定要有直身锁。

55. Mould requiring heating should haveinsulator plate. 需要加热的模具,必须有隔热板。

56. Mould preferred to run automatic;self-degating wheneverpossible. 模具最好能自动生产,模具尽可能自断水口。

57. No obstructions on buttom surface ofmold?模具必须稳定位置如有凸出物请加脚座,是否完成?

58. Overall mold size of the moldbase &shut height 模坯长宽和模厚(模架的长宽)

59. Outlets accessible and marked " INOUT and NUMBER"?出入水位有否打上IN 、OUT 字码?

60. Protruding items shown and protected. 画出突出部件并做好保护。

61. Parting line at the acceptable surface.合模分布在合理可接受的表面。

63. Put waterline for slide /lifter/insertwherever possible. 尽可能在行位、斜、镶件布置运水。

64. Parting line cleared and releasedproperly? 分模线是否正确?

65. Proper locating ring and diameter?定位圈尺寸及直径是否正确?

66. Proper radius and orifice on spruebushing and keyed.唧嘴R及管钉是否正确?

67. Part line lock recommended when thereis shut off. 当有擦位时,最好有直身锁保护。

68. Protruding items shown and protected. 如有零件凸出,模坯请加保护物。

69. Proper K.O. holes size and location. 顶棍孔尺寸及位置是否正确?

钢 steel 混凝土 concret 铁 iron 钢筋 rebar 目前就想起这么多

70. Runners to be balanced. 流道必平衡。

71. Runners cross section type and size asper standard. 流道切面形状和尺寸符合标准。

72. Runner and parts should be ejectedautomatically .Multipleejection should be avoided. 顶出方法可使流道与产品自动掉下,避免运用多次顶出方法。

73. Sufficient view and section. 足够的视图和切面图。

74. Safety Strap in red. 模块藏入模坯,要涂成红色。

75. Standing steel supported to keepstable. 加撑脚以保前、后模能平稳放置。

76. Support pillars>50% part projectionarea ,steel :1040。撑头面积大于50%的产品投影面积,材料:1040。

77. Safety strap clear tie bar? 锁模块与哥林柱冲突吗?

78. Sucker with reverse 10 deg. Undercut.10度倒扣的流道拉料杆。

79. Steel type & hardness of slide&heel blocks. 行位和压条的料号和硬度。

80. Sufficient stroke oflifters(1/16"+ undercut size)?斜顶是否有足够的行程(1/16”+倒扣尺寸)?

81. Sufficient stroke for floating plate?浮动板是否有足够的行程?

82. Sufficient stroke as well as part andrunner falls clear. 是否有足够的行程使品和流道脱落?

83. Spring around return pins and pressratio<33? 是否有回针的弹簧及其压缩比(<33%)?

84. Special instruction stamped on top andoperator side?客户如有特别指示请打在模坯顶及操作面上,有否完成?

85. Screws tight and all installed?螺丝是否全部收紧?

86. Support posts ground and screwed toclamp plate and pre-loaded. 撑头是否高出方铁?

87. Spring pockets correct depth ,springdeflection max.40%?全部弹弓压缩比是否为1/3 ?

88. Standing steel well supported?成品与内模之间的钢材是否足够?

90. Self-degating whenever possible .Hotrunner system should beconsidered.…… 热流道系统应该加以考虑。

91. Standard components should be used. 尽量使用标准件。

92. Semi-automatic and use of mould releaseacceptable. 半自动工手放镶件也可。

93. Update title block/revision. 更新标题栏/版本。

94. Use standard components whenappropriate. 适当的时候使用标准件。

坐钢筋意思是在结构图平面图上看都支座钢筋,其实就是指除了贯通筋之外,在支座处增加的加强筋,俗称扁担筋,在支座处增设的钢筋,一皮筋挑出长度为净跨的三分之一长,二皮筋长度为净跨的四分之一长,看一下101图集,那上面有。

95. View of deepest point 最深点(位置)的剖切视图

96. Water circuits should run out form theejection box. 运水应从出水槽中流出。

97. Waterlines clear tie bar and clampslot? 运水是否同哥林柱和模槽有冲突?

98. Will mould fit in quoted press? 可否配合客户啤机?

99. Waterlines clear tie bars. 运水喉咀接驳位要离开啤机呵林柱咀接驳。

100. Waterline clear clamp slot. 运水喉咀接驳位要离开啤机码模坑。

咨询电话:

steel bar也可以作为英语的钢筋

如果您喜欢本文章,欢迎您分享和转载,因为您的爱心,会点亮更多人的生命!感谢您!

上一篇 2023年04月16 16:18
下一篇 2023年04月14 06:32

相关推荐

  • 微积分英语教材,微积分英文版哪个好

    微积分英文版哪个好,【新智元导读】你有见过160多年前清朝数学家写的微积分书吗?这可能是最难懂的高数教材了,堪称天书!近日,网上流传着一本清朝的微积分课本,其中的所有数学表达式都是用文言文书写的。小编

    2023年04月22 257
  • 两周岁英语怎么写,一周岁英语怎么写

    二年级学英语早了吗?二年级开始学英语早吗?家长人家2岁学英语的都不觉得,英语这个东西看你怎么对待他,把它当成一个工具。你当然可以从小就是开始学语文的时候,开始叫妈妈了,就开始学英语了。这个没有什么奇怪

    2023年04月24 297
  • 英语写作纠错网站,英语语法纠错网站

    中高考在即,英语作文提分难,是让很多考生头疼的问题。针对中国学生英文写作中的常见问题,近日,搜狗AI翻译团队上线了AI写作助手,集“实时语法与拼写纠错”、“语句润色优化”和“批改前后对照”三大特色功能

    2023年06月01 225
  • 新概念武器装备主要有,新概念武器主要

    什么是新概念武器呢?就是指与传统武器相比,在基本原理、杀伤破坏力和作战方式上都有本质区别,能大幅度提高作战效能,尚处于研制或探索之中的一类新型武器。高技术的发展,正在引起各国军队武器装备的巨大变革,也

    2023年04月13 1122
  • island怎么读英语,sland英语怎么读

    在学习英语读音的时候,有些规律掌握了会少走很多弯路。比如,有些字母在单词里面是不发音的。今天我们一起来看一看:哑音字母b:字母b在m之后或t之前且mb,bt处于单词的末尾时(注意:member中的b发

    2023年06月06 276
  • 眼睛怎么用英语读?,眼睛单词怎么读?

    词根ocul=eye/bud眼睛/苗1.ocular[ocul眼,-ar形容词后缀,...的]adj.目镜的,眼睛的,视觉的,目击的眼镜英文:glasses。关于glasses的短语:1、weargl

    2023年04月16 229
  • 火球用英语怎么说,火球英文怎么读

    火球英文怎么读,大西洋东部有史以来威力最大的飓风奥菲利亚(Ophelia)逐渐逼近英国,全国都在加紧应对这个超强的飓风。人们注意到在英国的部分地区太阳就像一个红色的火球,将整个天空染成了红色。图为今日

    2023年04月26 257
  • 四万英语翻译为中文有多少字,英文翻译中文字

    很多这外企工作的朋友,一般英文沟通还可以,但最怕的就是在讨论业绩目标和预算。心里明明知道要讲哪个数字,但话到嘴边,英文翻译中文字,总是慢半拍,甚至讲错金额导致业绩目标差了十万八千里,或是老外批哩啪拉很

    2023年04月22 264
  • 季节用英语怎么拼,季节这个单词用英语怎么说

    大家好,我是林老师,欢迎大家和老师一起轻松有趣快乐记单词!一年四季,春夏秋冬!现在正值冬季,那么春天就不远了。而小学生也纷纷考试准备放假了,在考英语的时候是不是有这样的烦恼:单词怎么也记不起来了,好不

    2023年04月10 262
  • 原来翻译成英语怎么说,那个用英语怎么说翻译成英语

    interpretforsb给……当翻译(多指现场口译、包括交替传译和同声传译。);解释,说明;口译;翻译经典例句学习:Shecouldn&#39;tspeakmuchEnglishsoherchil

    2023年04月20 249
  • 科学家英语单词,用英语介绍一位科学家

    高中英语252个常用英语词根高效单词记忆252个词根都是什么第一部分核心词根1、agag=do,act做,动agent[ag做,办理,ent名词后缀,表示人;做事者,“办理人”]代理人agency[a

    2023年05月04 320
  • 三年级下册一单元课文英语,英语三年级下册第一单元朗读

    人教PEP版小学三年级英语下册第一单元,教材原文同步音频英语学习涉及听说读写,通过上半学期的学习,英语三年级下册第一单元朗读,孩子们虽然掌握了一些简单的用语,但在听说读上,毕竟积累的还是太少,所以小编

    2023年05月22 273
关注微信